Build Your Quote
The quote builder lets you explore the product range adding items to a basket as you shop the different timber mouldings for your project.
In-Stock Range
Our most popular skirting, architrave, and wall panelling products, ready to ship in 2 days
Skirting and Architraves
See our vast collection of skirting and architraves styles to suit Australian homes and commercial buildings
Timber Mouldings
Make your Interiors Spectacular. Explore our large range of custom Australian made to order timber mouldings.
Wall and Ceiling Panelling
Explore our range of wall panelling products including large sheets, lining boards, wall battens and Wainscoting
Intrim Exclusives
Our range of patented, innovative moulding designs available only through Intrim, reinforcing our position as market leaders in bespoke timber mouldings.
Order Samples Online
Order your timber mouldings samples online today.
Products
Explore our range of custom Australian made to order timber mouldings for residential and commercial applications.
Our Work
Explore how Intrim Mouldings are used to create spectacular interiors across a large collection of projects, building types and styles.
Recent projects
Collaborations
We collaborate with some of Australia’s leading designers and builders who share our passion for creating WOW interiors. Explore their inspiring work and see how mouldings elevate every space.
Three Birds
Oak and Orange
Front Porch Properties
Indah Island
Design Styles
Explore the design style for your project to see a collection of profiles to suit your project
Building Styles
Videos
Explore our library of videos.
The Inside Track
Collabs
Shadowline Installation Videos
Gallery
Explore the image library. Filter by style, product type and more, to find images to inspire your spectacular interior
Inspiration
Be inspired to make your interior spectacular. Explore our large collection of case studies, visit our image library, see inspiration by design style or building type and more.
Blog
Read our blog for the latest information on design, trends, products, tips and more.
Recent posts
Guides
Learn how to plan, select, budget, order and install timber mouldings in our useful guides filled with tips and links to everything you need to know.
Forms & Documents
A library of various documents you may need for doing business with us
Commercial Resources
Specifiers and designers resources
Help Centre
Visit our help centre where we answer your most frequently asked questions. How to buy from us, invoicing & payments, lead times & delivery, faults & returns
News & Resources
All your guides, instructions, files, forms and more
Sample Boxes
Shop online now at Intrim for all your renovation and building needs, including DIY wainscoting kits, VJ boards and more. Intrim has the perfect solution for your interior build or renovation project. Shop online today!
About
Read about our vision, mission, and core values
Meet The Team
People are the heart of our business. Meet our leadership team and key staff members here.
The History of Intrim
Company history of Intrim an Australian family owned business
Careers
Working with Intrim is a rewarding experience as part of a great team. Roles are regularly updated here
Testimonials
We are proud to be part of our clients projects. See what they have to say
Contact Us
Contact us here or find all our details to mail us, call us or visit us. We offer design consultations at our Sydney showroom. Contact us to book in advance.
Locations
See our site locations, and where you can visit a showroom, display or find a distributor
Contact
Contact us here or find all our details to mail us, call us or visit us. We offer design consultations at our Sydney showroom by APPOINTMENT ONLY. Contact us to book in advance.
Find a Recommended Installer
Become a Recommended Installer
Find an Installer
Learn how to install Intrim Shadowline® SK800 skirting and DJ800 door jambs using these step-by-step instructions, diagrams and video guides.
Home > Product Installation Guides > How to Install Intrim Shadowline
Unlike traditional P50 and L-bead shadowline installation methods, Intrim Shadowline has a 10mm shadow gap machined directly into the board. The shadowline detail does not need to be constructed on site using separate metal angles or plastic beads. This creates a cleaner, more consistent finish while reducing installation time and site complexity.
The standard SK800 system and fire-rated SK800FR system have different installation requirements. Select the relevant guide below and follow the instructions for your project.
Intrim Shadowline SK800 is an integrated skirting system designed to create a clean, flush finish without the separate angle, noggin or multi-step process associated with traditional installation methods.
Cut the DJ800 door jamb material to required lengths. Make a 45-degree mitre cut at the top of each stile and at both ends of the head. Assemble the mitre joints between the head and stiles using PVA glue and nails or screws. (Detail A)
Pack the opening and install the DJ800 door jamb plumb and level. Take care when installing jamb material, to make sure it is fixed parallel with timber framework.
Calculate the required jamb width by allowing for:
For example, a 90mm frame with 10mm plasterboard and approximately 3.5mm of plaster set on each side requires a total jamb width of 117mm. This leaves 13.5mm between the frame face and the jamb face on each side.
Once the DJ800 door jambs are installed, cut the SK800 skirting to fit neatly between the jambs and the internal and external corners. Use 45-degree mitre cuts at corners.
When joining skirting along a straight section of wall, use a splice joint positioned over the centre of a wall-frame stud. Do not use a butt joint.
Fix SK800 to:
Fix the skirting into every stud at a maximum of 600mm centres. Use:
Include one fixing approximately 20mm from the base of the skirting and another through the centre of the ribbed section at the top.
Install 5mm packers between the bottom edge of the skirting and the floor to allow for subframe movement.
(Detail B) (Refer to Figure 2)
Install the plasterboard to the framing in accordance with the plasterboard manufacturer’s specifications.
Cut and fit each sheet as close as possible to the door jamb and skirting edges. Where possible, position the factory-finished plasterboard edge against the top edge of the SK800 skirting.
Install PLTB 630 30mm x 6mm tear off PVC stop beads around the door jambs. Install the required perforated metal angles at external wall corners. Cut corner intersections carefully to minimise the build-up of plaster-setting compound. (Detail C)
Remove all dust from the ribbed section at the top of the skirting before applying plaster-setting compound.
Set the joint where the bottom edge of the plasterboard meets the SK800 skirting using FibaFuse or paper reinforcing tape. Using a tape outside the recommended tape types may void the product warranty.
Position the tape centrally over the joint. The bottom edge of the tape should finish approximately 5mm to 10mm from the bottom edge of the skirting’s ribbed section.
Install all plaster-setting products and accessories in accordance with the relevant manufacturer’s specifications and instructions. We recommend using USG Boral and CSR plaster products only.
Installation tip: Allow every coat of jointing compound to dry fully before applying the next coat. Drying generally takes approximately 24 hours in normal conditions or 48 hours in cool conditions. Insufficient drying can contribute to cracking at the plasterboard and skirting junction. See USG Boral instructions here.
Apply plaster-setting compound to the PVC stop beads around the door jambs. Install and finish all plaster-setting products in accordance with the manufacturer’s specifications and instructions.
Apply all required coats of plaster-setting compound, including the finishing coats, and sand the joints smooth.
Once the compound has dried, tear off the exposed PVC lip from the stop bead around each door jamb. The surface is now ready for painting. All plaster set and accessories must be installed to manufacturer’s specifications and instructions.
The SK800FR installation must comply with the system configuration and conditions set out in the relevant CSIRO assessment and Intrim installation instructions.
The assessed system uses steel wall framing, fire-grade plasterboard, FR MDF SK800 skirting and specified Rockwool insulation installed behind the skirting. The SK800FR profile has been tested to AS 1530.4-2014 and can achieve an FRL of -/60/60 when installed as specified.
Download the Shadowline SK800FR Installation Instructions and confirm all project-specific requirements before installation.
IMPORTANT: The standard SK800 instructions must not be used as a substitute for the SK800FR installation specification.
Plasterboard lined wall system incorporating 64mm steel stud wall framing, lined on both sides with 16mm thick CSR Fyrchek plasterboard (or another brand with same fire rating standards), and the 18mm thick SK800 Shadowline FR MDF skirting board, screw fixed along the bottom of the steel framing, on both sides of the wall frame.
The bottom of the wall frame cavity must be lined with 50mm thick x 60kg/m3 Bradford Fibretex 350 Rockwool insulation board, continuously behind the skirting board and between the steel studs and must have a minimum distance of 160mm between the top edge of SK800 skirting and the top of the insulation board. (Refer to figure 1 below).
Cut SK800 to required lengths to fit neatly between door jambs and internal and external corners of framework. Cut SK800 skirting with 45-degree mitre cuts for internal and external corners. FR MDF SK800 must be screw fixed to steel frame into every stud at a maximum distance of 600mm centres. (Minimum of 2 fixings per stud up to 90mm wide, minimum of 3 fixings per stud for 135 to 185mm wide and minimum of 4 fixings per stud for 235 to 285mm wide). These fixing points must include 1 fixing 20mm from base of skirting board and another fixing must be through the centre of ribbed section at top of skirting board. Install with 5mm packers between the bottom edge of skirting and floor to allow for any subframe movement. Apply a bead of Bindex Fire & Acoustic Sealant between base of skirting and floor substrate.
Using 50mm CSR Fibretex 350 Rockwool. Cut and fix in between framing studs and rear faces of skirting boards allowing a maximum distance between the face of the insulation and the rear face of skirting of 14mm. The height of the insulation must be 160mm minimum above top edge of skirting.
Using 16mm Fire Grade Plasterboard, Install plasterboard sheet to framework as per manufacturers specifications. Cut and fit plasterboard sheet as close as possible to door jamb and skirting edges. Preferable to have the factory finish plasterboard edge sitting on the top of SK800 skirting edge.
Brush down the top ribbed section of the skirting to remove all dust prior to plaster setting. Set all plaster joints including the joint where the bottom edge of wall plasterboard sits on top of the Shadowline skirting, using paper joint tape or FibaFuse tape. (Any tape used that does not meet the recommended tape types will void all warranty). The tape should be positioned within the joint, so the bottom edge of the tape comes within 5-10mm of the bottom edge of the ribbed section of skirting. All plaster set and accessories must be installed to manufactures specifications and instructions.
Apply all coats of plaster set including top coats to all plaster joints and sand. All plaster set and accessories must be installed to manufacturers specifications and instructions. TIP: to avoid the join between the skirting and plasterboard from cracking you must allow the jointing compound the dry fully between coats as per the manufacturer’s specifications and instructions. Drying times are approximately 24 hours in normal conditions or 48 hours in cool conditions between each coat.
The proposed construction shall be a steel plasterboard-lined wall that includes an Intrim Mouldings FR MDF skirting board backed with 50mm CSR Fibretex 350 Rockwool insulation as tested in FSP 1997 and subject to the following variations.
Shadowline skirting is normally installed before the plasterboard. When the project includes timber or tiled flooring, there are two sequencing options:
Recommended method: Install the flooring first, protect it with suitable floor protection, and then install the Shadowline skirting and plasterboard. This supports accurate set-out and a clean finished junction.
Alternative method: Install the Shadowline skirting first and leave the correctly calculated space below it so the flooring can be installed later. This approach requires careful allowance for flooring thickness, expansion requirements and the finished shadowline position.
The installation sequence should be confirmed with the builder, flooring installer and relevant product manufacturers before work begins.
Use FibaFuse or paper joint tape at the skirting and plasterboard junction. Do not use fibreglass mesh tape.
For timber and tiled flooring, determine the finished floor level and installation sequence before fixing the skirting. The recommended method is to install and protect the finished flooring before fitting the Shadowline skirting and plasterboard.
Use nails or screws for timber studs and screws only for steel studs. Fix into every stud at no more than 600mm centres.
We aim to turn around quotes within 1 business day!
Full name*
Company name
Email address*
Contact number*
Next
Delivery suburb*
Project name
Products*
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Fill in the form below to receive your free quote
Enter your details below to let us know how we can help with your enquiry
Call us on 1800 622 081
Shopping basket
Available 1 of 4
Available 2 of 4
Available 3 of 4
Available 4 of 4
Product basket
Need technical drawings? Tick here if you require technical drawings of your selected profiles.
Specification Sheet Store all your favourite profiles here.
Quote Request Store all your favourite profiles here.